Category Archives: Uncategorized

Finishing Touches

The late afternoon light cast a warm glow on Rocklin Hose Co. No. 1.   Painting and signage are complete.  A bench and light post welcome visitors. My brief visit for this photo was rewarded with the opportunity to ring the … Continue reading

Posted in Uncategorized | Leave a comment

Details Details

The existing sidewalk was extended with a new pour that reaches the two firehouse doors.  Trim has also been added to the large door which provides access to the large bay.   Look closely.  There’s a mechanism to ring the bell! … Continue reading

Posted in Uncategorized | 2 Comments

Oh so close!

Just a little paint and the exterior will be complete!   

Posted in Uncategorized | Leave a comment

Almost there

The siding is almost complete – just the front remains to be buttoned up.       Sample body and trim colors   

Posted in Uncategorized | Leave a comment

2 Down, 2 to go (maybe)

More progress on siding installation.  At least 2 sides are done.  I didn’t look at the back, so there are either one or two sides to go.      

Posted in Uncategorized | Leave a comment

Windows and Doors

There has been great progress since the previous blog post.  The slate roof looks to be complete.  Siding is being installed.  Note on the siding are a couple of paint samples for the body and trim.  A door and windows … Continue reading

Posted in Uncategorized | 1 Comment

Slate Roof and Bell

MS Clark roofing is installing the slate roofing tile today.  Late last week the bell tower was lifted and secured into place.  The bell has also been installed!        

Posted in Uncategorized | Leave a comment

The Cherry on Top

Posted in Uncategorized | Tagged , , | Leave a comment

Plywood Progress

Posted in Uncategorized | Leave a comment

Happy Fourth of July

Appropriate that we’re celebrating our country’s history today.

Posted in Uncategorized | Leave a comment